• Tel:0086-371-67816766
    Fax: +86-371-68617124
  • Kevin: +86-15038005999
    Angela: +86-15638227908
  • Add : Gongye Road and Tonghang Er Road crossing, Shangjie District, zhengzhou, Henan, China

Preparation before jaw crusher is running

Published 2014/11/5 11:23:30

Inspection and preparation before jaw crusher is running:


1. Before crusher is starting, lubrication points shall be checked for normality, blocking and oil leakage.
2. Grease pump of operating handle makes lubricating points oiling sufficient with refueling. 
3. Check all instruments for its good condition.
4. Adjust discharge opening to appropriate dimension.
5. Check if there are ore and crumbles in crushing chamber.
6. Adjust tightness degree of triangle belt and locking spring moderately.
7. Check if interlocking device of electrical appliance, connection of lights and defense device is impact and normal. 
8. Check if joint pin is loosening.


UP:How to use jaw crusher properly?
NEXT:Related details for proper use of jaw crusher

Address:Gongye Road and Tonghang Er Road crossing, Shangjie District, Zhengzhou, Henan

Copy Right: Henan Hongke Heavy Machinery Co., Ltd. All rights reserved.